Temporary Wall Systems Secure 900 Feet of Containment at Harry Reid Airport Terminal 1 Renovation
Las Vegas, NV
Airports & Public Transportations
During a major renovation at Harry Reid International Airport’s Terminal 1 baggage claim, Temporary Wall Systems installed over 900 linear feet of clean, secure containment across both Level 1 and Level 2. The temporary walls enabled active demolition and construction to proceed safely while maintaining a clear separation from heavy passenger foot traffic. As crews widened the Level 2 walkway and performed demo work below, the containment system provided critical protection and control in one of the airport’s busiest zones, demonstrating the strength and flexibility of Temporary Wall Systems in high-traffic construction environments.