Temporary Wall Systems New Orleans supported renovation work at the Audubon Aquarium during the construction of a new ADA ramp near the stingray touch pool exhibit. Working directly with Audubon Nature Institute and alongside Varuso Services, the TWS team installed approximately 75 linear feet of modular hard wall containment with poly sheeting extending to the deck above to fully isolate construction activity from guests, exhibits, and adjacent operational areas.
Because the aquarium remained open throughout the project, the containment strategy was designed to support visitor safety, operational continuity, and a positive guest experience while protecting nearby animal habitats. Specialized installation protocols and materials were used to help safeguard the well-being of the animals located adjacent to the work zone. Blue poly sheeting was incorporated into the containment system to better blend with the surrounding exhibit environment and reduce visual disruption within the space.