Temporary Wall Systems Salt Lake City partnered with Eckman Construction to provide a 32-foot-tall modular Connect Wall installation at Juan Diego High School during a major interior renovation project. The school was creating a new hallway and expanding a section of the facility, requiring demolition work immediately adjacent to occupied student areas. Maintaining safety while allowing normal school operations to continue was a primary project requirement.
To support the renovation, TWS installed a custom-height Connect Wall system designed to match the scale of the existing structure and create a secure separation between active construction and occupied school spaces. The modular hard wall containment provided a durable physical barrier that helped protect students, faculty, and visitors from construction activity while maintaining clear circulation routes throughout the building. The finished wall also delivered a clean, professional appearance appropriate for an educational environment.